... | @@ -70,3 +70,21 @@ See: http://tuotuogzs.ddns.net/droneoa/droneoa_ros/issues/49 |
... | @@ -70,3 +70,21 @@ See: http://tuotuogzs.ddns.net/droneoa/droneoa_ros/issues/49 |
|
- OA Controller (Stage 1 progress)
|
|
- OA Controller (Stage 1 progress)
|
|
- Research on existing algorithms for different sensor configuration
|
|
- Research on existing algorithms for different sensor configuration
|
|
- Build test vehicle
|
|
- Build test vehicle
|
|
|
|
|
|
|
|
### Productivity Metrics
|
|
|
|
- Client Meetings: 0.5
|
|
|
|
- Paper Prototypes: 0
|
|
|
|
- Exploratory Prototypes: 2
|
|
|
|
- Research Literature Report: 0
|
|
|
|
- Formal Logic Analysis: 0
|
|
|
|
- Tests
|
|
|
|
- Manual: a lot
|
|
|
|
- Machine Generated: 16
|
|
|
|
- Development
|
|
|
|
- Commits: 128
|
|
|
|
- Merge Requests: 32
|
|
|
|
- Issues Open / Closed: 51
|
|
|
|
- Lines Of Code
|
|
|
|
- Prototype: 1821
|
|
|
|
- Experiments:
|
|
|
|
- Build scripts etc.: 250 |
|
|
|
\ No newline at end of file |